Endurance Land
CLIENT
ARCHITECT
ORMS
ENGINEERING
Heyne Tillett Steel and GDM Partnership
PROJECT MANAGER
Avison Young
QUANTITY SURVEYOR
Quantem
Overview
With stunning views towards the Old Bailey High Court and the City of London, this building is formed of two interconnected elements: the Grade II listed front section (originally constructed in the early 20th Century) and the larger rear extension (built in 1999).
Through a structural remodelling scheme, both elements were significantly upgraded, providing ten floors of flexible, modern, Grade-A office accommodation with landscaped terracing on four floors and increasing the area of the building to 156,000 sq ft. A major part of the scope was the new glazed façade which interfaces with its retained elements.